Kiewit train station details & statistics

Information
Gare de Kiewit
City Hasselt
AddressKempische Steenweg
CountryBelgium
Zip 3500
The official SNCB page for Kiewit train station
  


Line 21A : Hasselt - Genk End of disruption. Delays may still occur.
11:30 (22/12/2014) A person has been reported along the tracks near Kiewit station. End of disruption. Delays may still occur.
Line 21A : Hasselt - Genk Trains are travelling at limited speed.
11:30 (22/12/2014) A person has been reported along the tracks near Kiewit station. As a result, travel times wil increase by 5 to 10 minutes.
Line 21A : Hasselt - Genk Trains are travelling at limited speed.
07:00 (14/12/2014) Result of evil intent between Kiewit station and Bokrijk station. As a result, travel times will increase by 5 minutes.
Line 21A : Hasselt - Genk Trains are travelling at limited speed.
07:00 (14/12/2014) There is a failure at a level crossing between Kiewit station and Bokrijk station. As a result, travel times will increase by 5 minutes.
Line 21A : Hasselt - Genk Traffic disrupted.
21:40 (29/09/2014) A problem with a freight train has been identified between Hasselt station and Genk station. As a result, travel times wil increase by 15 to 20 minutes. Between stations Kiewit and Bokrijk trains are running on a single track.
Line 21A : Hasselt - Genk End of disruption. Delays may still occur.
04:30 (26/09/2014) There is a problem with the signal between Bokrijk station and Kiewit station. End of disruption. Delays may still occur.
Line 21A : Hasselt - Genk Traffic disrupted.
04:30 (26/09/2014) There is a problem with the signal between Bokrijk station and Kiewit station. As a result, travel times wil increase by 15 to 20 minutes. Train traffic has been disrupted.
Line 21A : Hasselt - Genk Trains are travelling at limited speed.
04:30 (26/09/2014) There is a problem with the signal between Bokrijk station and Kiewit station. As a result, travel times wil increase by 5 to 10 minutes.
Line 21A : Hasselt - Genk Trains are travelling at limited speed.
04:30 (26/09/2014) There is a failure at a level crossing between Bokrijk station and Kiewit station. As a result, travel times wil increase by 5 to 10 minutes.
Line 21A : Hasselt - Genk Trains are travelling at limited speed.
15:40 (06/06/2014) There is a failure at a level crossing between Kiewit station and Bokrijk station. As a result, travel times wil increase by 5 to 10 minutes.
 
The statistics are based on data collected on sncb.be. The photos are from Foursquare